h1

ANALISIS FAKTOR PRODUKSI MODAL DAN TENAGA KERJA TERHADAP NILAI PRODUKSI

March 2, 2009

Dwi Hastuti L.K, Andi Rustandi, Fita Asri Artika

Jurusan Ekonomi Pembangunan Fakultas Ekonomi Universitas Siliwangi

 

 

 

ABSTRACT

 

The aims of the research are a) to find out the influence of the capital and the workers on the production value at a paving block industry located in Cisayong district in 1994-2005, b) to find elasticity level of production value on the capital and the workers at a paving block industry located in Cisayong district in 1994-2005.

The research method used is descriptive method, and the data used is secondary data (time series), while the tools used to analyse the data are R2-test, t-test, F-test. And for the validity test are autocorrelation-test, heteroscedastic and multicolinierity-test.

The analysis result shows that 1) simultaneously tested i.e. the capital and the workers have a significant influence on the production value of paving block in Cisayong district in 1994-1995, 2) Based on the calculation result it can be concluded that the level of the elasticity of production value on the capital is 0.25 and the variable influence is inelastic, whereas the workers also have inelastic with  the elasticity value 0.58 on the production value.

 

Keyword: capital, workers, production value

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: